Wednesday, March 21, 2012

Checking on Jobs

I've been making site visits and doing final touches on a few of my projects. 

I'm so excited to see how the modern bathroom is progressing.  I posted about the plan for this bathroom HERE.

It's all about the tile on this job and after much tedious work laying everything out just the way I wanted, the tile installer is on his way, getting a smooth, beautiful installation. 

(This was an installer I haven't worked with before and he didn't like me much at first!  I'm a LITTLE picky.)

We're moving along now and things are looking great. This is a great example of how design sometimes has to be worked out in the field.  The back wall here had settled and was tilting out from the floor to the ceiling (exterior wall). Since the tile must wrap around the corner the way it does, the angle in the wall would've shown as angled cuts in the tile.  That whole wall had to be floated to get straight cuts. 



The concept here is to make this space seem as big as possible, hence the horizontal banding with tile wrapping around the room continuously. I had planned for the tile to be run with a grout joint centered on the sink at the vanity.  Once we laid it out, we discovered that it looked better in the corner of the shower with a  1/2  tile at the end to appear as if it wraps around the corner.  Then I shifted the center line of the tile to the vanity center and liked that layout much better. I know, boring......but these little things are sooooo important!  Those shampoo niches HAD to be exactly centered in the tile band, same with the wall sconces at the vanity.  An inch off would just kill it for me!


Before windows - single pane traditional


Not for this modern bathroom!


After windows - double pane rain glass

A sheer pleated shade will cover these for some softness and more horizontal lines.



Corner fireplace in the master bedroom on this job.


Before
That little tiny piece of painted wood on the left is a mini door to put your hand into the wall to turn on the gas. !!!   We fixed that.

You can't see it under the propped up tile, but there's a proper escutcheon and key for the gas valve installed now.  I love this slate, Thorntree's Emerald Green. It looks great just butted together with no grout.  The variation in thickness of the tile gives it a real natural stone appearance.  Outside edges are all bullnosed for a clean installation.



Another bathroom remodel site visit, this one is traditional.



Still work to be done on the cabinetry, caulking at the sinks, mirror frame finish to be applied, etc.  The tile work here is impeccable.  Love the tone on tone glass and onyx mosaic.  It looks like it was made for the Zin limestone counters.






Finishing touches on another project.


Some Tableaux grilles were installed in the vacant looking windows below.  We didn't need window treatments way up there, just some kind of delineation and interest. The Tableaux worked well with the railing and front door ironwork.  Accessorizing will happen later on down the road.





You can see how vacant these windows looked before the Tableaux grilles were installed.


I really love going to job sites, seeing it all fall into place.  It's just the best part of design.



I'm so excited about being named a Design award winner from Houzz.com!

The Best of Remodeling, Houston award is based on the number of times my work's professional images have been saved into personal ideabooks.  (They even sent me a press release!)
Thank you, Houzz.com!


If you're not a follower of my blog, I would love it if  you would become one!

Saturday, February 4, 2012

Site Visits

Lots of construction going on with my projects this past week. 




New cabinetry in a master bath remodel.  We removed the furr down and are taking the cabinetry and mirror to the ceiling.  It looks better already!


Before





Beautiful tile job in a second bathroom.  She wanted some detail, but I didn't want too much contrast or design in the shower to visually distract from the vanity area, so it's just a change in pattern and tile size of the neutral limestone.





Another job....



New cabinetry for a flat screen tv.



Before



Demo at another bathroom remodel.  Tiny shower is out!




Everything has been measured carefully on site to squeeze the maximum out of the small, given space.



New tub deck for our rectangular tub in this modern bathroom redo.




See, it's starting to take shape.



Can't wait to have these traditional, single pane windows gone.  They will be replaced with double pane windows in a rain glass for privacy.  We will cover these with a translucent Roman shade to filter the light and add some softness to this modern bathroom.

Progress!  I love it!

Thursday, August 18, 2011

Job Site Visits


Job site visits today! 
This remodel project involves turning a dated 90's contemporary property into a more traditional home.  The fireplace is coming along. 



Traditional corbels and paneling and an appropriate scale and weight for this big space helps transform the look.




Right after demo.  All mouldings and tile were removed as well as stepped sheetrock detail at the ceiling.



Fireplace Before - smallish, plain, and unimportant

On to the bathroom! 



Tile work looks great.  A warm golden color scheme was desired by my client, achieved with the Angelica travertine for flooring and bathroom tile.  Fitting a traditional tile pattern and layout around the existing modern window helps marry the styles and looks purposeful.


 

Shower tile work




Niche at the tub area. Waiting for the Angelica limestone ledge.

On to another job site. 

New  paint on the dark wood paneling and new wood flooring. 



Before



After - Yea!!! 

I've been soooo busy this summer, not quite on top of my blogging. Busy is good though!  I've got a fun apartment decorating project to post next.  I'll be back next week!